Final Corridor Study Report (File Size 7 mb)
Appendix A - Study Area (File Size 1.5 mb)
Appendix B - Public Involvement (File Size 11 mb)
Appendix C - Agency Coordination (File Size 4 mb)
Appendix D - Railroad Coordination (File Size 1 mb)
Append E - Preliminary Cost Estimates (File 1 mb)
Appendix F - Railroad Corridor, Planning Level, Plan and Profile Drawings (File Size 160 mb)
Appendix G - Grade Separation, Planning Level, Plan and Profile Drawings (File Size 49 mb)
Metropolitan Planning Organization West Central Indiana Economic Development District 1718 Wabash Ave., Terre Haute, IN 47807 (812) 238-1561