Project Highlights:

wallace to hulman street.png

LOCATION 

Brown Avenue from Wallace Avenue to Dean Avenue

FACTS

The roadway is narrow and is in need of repaving. There are no sidewalks on Brown Avenue. In addition to the poor condition of the roadway, this area of the City has drainage and storm sever infrastructure issues. The City often gets complaints of flooding after a heavy rainfall event in this area.

PROJECT GOALS 

  • The project consists of reconstructing the roadway from Wallace Avenue to Dean Avenue
  • Widening the roadway to safely and better accommodate traffic flow
  • Adding a storm sewer system and curb and gutter
  • Sidewalk will be added to the west side of Brown Avenue
  • Planned future trail project comes on east side
  • Construction start – Late summer 2023